Above the sixty-sixth floor, construction was completed of the curvature of the Chrysler Building's dome. Angled pieces of steel were fabricated on the floor of the Federal Shipbuilding and Dry Dock Company and transported to the site. The last of the 20,961 tons of structured steel used in constructing the building was installed on September 28. 10/7/1929